Methodology for the numerical experiment of laying headers under motorways in a closed way
Abstract
Methodology for the numerical experiment of laying headers under motorways in a closed way
Incoming article date: 07.05.2021The methodology of numerical experiment of laying with closed method by methods of horizontal-directional drilling, brown-screw drilling, forcing, microtonneling has been developed. Some features of the construction of cases for penetration by collectors under existing highways, including general information about the used materials of the cases, are given. A selection of controlled factors and experiment planning, system stability check, results reliability analysis was performed.
Keywords: collector, numerical experiment methodology, microtonneling, horizontal directional drilling, brown-screw drilling, puncture, forcing, motorway, case, reinforced concrete, metal pipes