Organization of complex flows at capital repair of hotels

Abstract

Organization of complex flows at capital repair of hotels

Nefedova V.K.

Incoming article date: 19.04.2023

Complex flows (CFC, CFA, СFP) are calculated using the critical method. A comparative analysis of the methods of complex flows was made, which showed that the CFC and CFP have the shortest duration of the overhaul of the facades of three objects, which is 131 days. Based on a comparison of the options for calculating complex flows by different methods, we can conclude that the CFP method is the most suitable, because the duration of the overhaul is the shortest. CFP is the traditional and most optimal method that ensures the minimum duration of the whole complex of works and is widely used at the present time.

Keywords: complex flows, calculating, methods, duration