×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

On the issue of inspection of consoles of precast reinforced concrete columns in case of manufacturing errors

Abstract

On the issue of inspection of consoles of precast reinforced concrete columns in case of manufacturing errors

Iodchik A.A., Chebrovskiy A.A.

Incoming article date: 26.05.2024

The paper presents the results of the survey of consoles of precast reinforced concrete columns of an industrial building under construction. The consequences arising from errors during the manufacture of columns, as well as the method of calculating the console are described. The survey was carried out in order to detect the position of the reinforcement in the consoles of reinforced concrete columns. When performing a survey of the technical condition, the following tasks were set: to determine the actual condition of the supporting structures, their mating nodes at the time of the survey, to establish the actual reinforcement of the structures, to give recommendations for the restoration (strengthening) of the bearing capacity of the column consoles.

Keywords: inspection, load-bearing capacity, concrete, column, reinforcement, strengthening