A characteristic feature of urban construction is an increase in the density of buildings and, accordingly, the tightness of working conditions. The need to ensure the safety of existing buildings and reduce negative impacts on the urban environment requires the development of rational solutions at the stage of organizational and technological design during construction in conditions of dense development. The factors of constraint affect already at the stage of preparation of the construction site. The purpose of the study is to select and justify the methods of work during the removal of engineering networks from the construction site. The existing methods of network re-routing and technology comparison are considered. An example of a construction object shows a variant of an organizational and technological solution for the removal of networks using trenchless technologies.
Keywords: engineering training, construction site, dense buildings, cramped conditions, trenchless laying of networks