  • Managing the construction process with a digital construction organization project

    This paper analyzes the shortcomings of the existing organizational and technological documentation, namely the construction organization project and the project of work production. It is concluded that the main task of organizational-technological documentation is to minimize construction risks at the earliest stage, to increase knowledge about the project and to transfer the process of development and decision-making to an earlier stage of construction. As a solution to these problems, it is proposed to consider the use of building information modeling technologies (BIM) in construction, and move to the development of digital construction organization project (4D model of the construction process), which is a digital information model of the capital construction object (3D model), the elements of which are interconnected with the work on construction production. Two projects where the building information modeling technology was applied and a digital construction organization project was developed are considered: construction of an underground tunnel and reconstruction of a power unit of a combined heat and power plant. The advantages of using a digital construction organization project are proved, which makes it possible to forecast the planned duration of works, as well as the duration of works, taking into account the occurrence of risk events, necessary resources and equipment.

    Keywords: digital project of construction organization, 4D model, building information modeling, project of construction organization, capital construction object

  • Using the transformed Harrington desirability function to calculate the quality index of construction production

    The problem of a comprehensive assessment of the quality of construction production is considered. The problematic nature of such a procedure is noted, due to the fact that construction production is a multifactorial process in which a large number of material, financial and labor resources are used, with different units of measurement. It is proposed to consider the complex indicator "Integral indicator of the quality of construction production" based on the transformed Harrington desirability function, which allows taking into account many factors having different-sized controlled parameters.

    Keywords: quality of construction production, integral index of construction quality, quality coefficient, generalized utility function, Harrington desirability function

  • The use of the "Quality Index" in the assessment of construction and installation works

    The problem of quality in construction and installation works at intermediate stages is being discussed. The role of technical supervision in the construction process is outlined. A proposed indicator, the "Quality Index," is presented for consideration, which reflects not only the quality of the works but also the effectiveness of the technical supervisor's work during the construction process.